Wednesday, September 30, 2009

A Brazilian Look Like

The Art of Laughter

The art of laughter.
Conference and with Jos Houben.

Jos Houben is Belgian (!). Professor at the prestigious Ecole Internationale de Theatre Jacques Lecoq, he worked under the direction of Peter Brook, and is presenting a lecture on the art of laughter will be missed.

"To pay unuseful is the best gift you can get these days. "The Express

" In fifty minutes, a compelling conference, very logical and completely mad. "Le Figaro


" It's devilishly effective. "
Point

" It's short, simple, smart and funny, of course. "
Le Journal du Dimanche
6, 7, 8 and 9 November 2009 at 20h.

Duration: 1 hour approximately.


Info and reservations: 02.35.47.63.09

www.theatrebainsdouches.fr

Sunday, September 20, 2009

Free Sean Cody Preview

Already a finished work

Well, the toilets are finished .. It remains to buy a new brush, the trick is orange plastic not great .. lol ..

Monday, September 14, 2009

Sentinel Safenet Usb Emulation

more ...

hello!
The toilets are almost finished ... still more than the paper .. and ask two or three touches at the join of the tile ..
@ +

Tuesday, September 1, 2009

Bren Everett And Brent Corrigan Freed Dowloands

the holidays are over ...

Hello, so my revolver with a new computer that crashes over too well, vee able to update the blog more regularly.
To outline;
We went on holiday one week in Britain .. It was too much, I even took sunburn, sisi ..

I'd make a link with pictures of our vacation, patience ... Otherwise

for work , It is going well, the second evacuation was laid, glued and buried ..

The hot water took it up .. and finally a washing machine also ..




The floor of the new toilets are installed (the toyo red in the picture is a bit behind ki, not a definitive toyo lol)


remains to be done;
-finish tile the toilet, put the paper and install the bowl ..
-install the sliding door of the closet of a washing machine and water heater ..
-lay the 2 doors of the bathroom and laundry.
tiles cut-off corridor (without farting others), re-level and with the same tile recarreler ..
-wall and remove the old bathroom door and re-opening in the bathroom, giving the shower ..
-flowing screed with the evacuation of the shower, bring water to the ceiling of 2 infants, plastering, tiling, putting tiles, ect ....
-fart all the old tiles in the bathroom, put it all straight, and recarreler ..
-BRIEF OF WORK IS STILL has that train there, everything will be finished for Christmas ...
@ +