Monday, May 31, 2010

Rikers Island Visits Days

end holiday

Tomorrow is June and we must return to the office, colleagues show my hands bruised by three weeks of manual work. This

will be an opportunity to hire a few for future work, hehe!

short, before beginning days of computer, I had to finish a few things in the house ... Prepare the power supply to the lift pump from the plant (slight shoveling), lay the first stones of the wall of the shower (syporexage average) and improve the high windows with these boards who work hard (hard screwing). We also went to visit career for rollers, pozzolana and other materials.

Three photos to illustrate this:

Big red maggot for the lift pump.


An overview of where we do not see the small improvements screwing.



And neither, hehe!

Sunday, May 30, 2010

What Kind Of Laptop Do I Need?

shower after ....

I begin to lay the tiles ...

Saturday, May 29, 2010

Russianbare.com Online

This summary is not available. Please click here to view the post.

Wednesday, May 26, 2010

Brent Everett Blog Spot

tiles tiles bis

another day tiling, then from 10:00 ET not a very fast pace in the afternoon. So it's early, but it's not finished yet. Terminus of tile approximate tomorrow.
Fronius has taken its place (whatever that) and expect to produce ...

Some pictures (it's a bit hard up photography at the moment, it was because of the time it takes to lay tile, install the flooring and other fun activities imposed) ... Besides my fingers are encrusted sandstone because of the projected cuts in ... It scratches a little but we made it;)

Balance tiles:
- corridor: OK
- lounge: OK
- Dining: OK
- kitchen: Presqu'OK
- Entry: I do not know if there will be enough.




Tuesday, May 25, 2010

Pruritus Treatment & Medecine



With the return of rain, nothing like a break from tiling to spend the day ... That in one day what we asked ... For the "joke", I invite the Musclor of casto who promised us that these tiles could be cut to the tile ... hey hey, of course we can, but must be more muscular than reason, right? Chainsaw water, makes the case much better. So the tiles of the corridor is finished, it's almost fair.
the floor of the bathroom and toilets are to be finished.
Tomorrow's technicians spend at Auger finish installing photovoltaics.
Next week is scheduled for Consuela.
Next week, likely arrival of the water heater.
We received the first maintenance fee which we had the potential for home - in fact not the first, largest, most expensive and most dishonest, it is the VAT. 19.6% on all ... equipment and manpower ... even if it's green, even if it's cheap. It's new, so everything is at 19.6 - is the logic of the Supreme bullies. That's how photovoltaic equipment installed by professional in two houses (one in construction and renovation) does not cost the same price as double glazed windows, such as tissue paper, such as wood fiber, such as phyto ... oh no, for the plant association is therefore the state does punctured the study of our sewerage system and toilets ... He catches up on the material of the plant. Otherwise, it still feels fortunate to be able to pay our taxes honestly ... until we earn enough money to pay someone to explain how we no longer pay them. Oops ... I'd got carried away?
To make me forgive 3 pictures of the progress.




Sunday, May 23, 2010

Cheat Pokemon Chaos Black

one week

It's been a short week that I have not made a single update on this site ... whose fault? to advertising in which products castorama castoche as prosecutors, obviating the room in half a day ... when one is filled over four arms and the strength of a bull, perhaps? Anyway me, it took me some time to lay the flooring in 4 rooms. We added an underlayer all green, like grass, to have a more consistent thickness and insulation that goes with it. Perhaps the fault of the engineer who in Julian have not yet found the formula of white paint to limit single-layer, single-layer actually. Unless this is available but the product would not be lucrative, is not it?
So, the week just passed, I have spent in the house ... to work.
Suddenly, the ceilings are white.
Suddenly, the rooms have parquet floors.
Suddenly, the pantry is almost finalized (still a little coat of paint, screws and sika).
So, I started to climb a wall, we saw about fifty bricks that we have on our hands ... it's heavy, these bricks ...

I give you some pictures to put you in the tooth before announcing the program next week:







Program for next week:
-
Tile - Finish the siding around windows
- Building the wall of the shower and make the coatings.
- Building the kitchen to ask the hood, the work plan, the bar ... everything, everything ...
- Greet technicians to install photovoltaics.
- Hosting technicians seol for consuel (if they come next week)
- Contact the plumber to know when he returns.
- Planning the weekend plant.

With a program like this, I'm not sure I can go to update the blog this week. But you never know? Feel free to go anyway ...

Sunday, May 16, 2010

Difference Apo-sertraline Sertraline

shower more ...

Voila, the shower is ready to tile ...


...


Otherwise yesterday the blue card is still heated, a device that I adapt to our barbecue chicken ... too good ...

Friday, May 14, 2010

Had The Flu, Now Have Lump Throat

But what is it??

Yesterday, tinkering plumbing of the shower, I see that the heating ducts are covered with gray dust, but what's this? y 'everywhere in the attic, it looks like from the ashes ... in any case, it was not there 2 months ago ... blizzard ...


Otherwise the shower, I recork holes ...


Here it is 6:46 p.m., the primary is set, the remaining layer of waterproofing ...

Thursday, May 13, 2010

Effects Naseptin Nasal Cream



few days to handle the roll and everything under placos are lying ... Evidence in pictures?
the way, the brick wall is finished, waiting for the electrical installation consuel, batting is all blown into attics are the tiles are clipped to almost everyone in the house and the list of errands to do to finish this house s riser.






A new addition, the neighbors are back ...


Monday, May 10, 2010

Look A Like Denise Milani

The shower, more ..

My dad asked us to evacuate water from the shower ..


then poured the slab ...



I rectify the wall has more right, go across the waterproofing layer
and tiling. Oh yes before also must I bring cold water and hot water .... oops .. lol ..

Thursday, May 6, 2010

Preparation For Drinking Session

lying under it looks like something