Sunday, September 20, 2009

Free Sean Cody Preview

Already a finished work

Well, the toilets are finished .. It remains to buy a new brush, the trick is orange plastic not great .. lol ..

Monday, September 14, 2009

Sentinel Safenet Usb Emulation

more ...

hello!
The toilets are almost finished ... still more than the paper .. and ask two or three touches at the join of the tile ..
@ +

Tuesday, September 1, 2009

Bren Everett And Brent Corrigan Freed Dowloands

the holidays are over ...

Hello, so my revolver with a new computer that crashes over too well, vee able to update the blog more regularly.
To outline;
We went on holiday one week in Britain .. It was too much, I even took sunburn, sisi ..

I'd make a link with pictures of our vacation, patience ... Otherwise

for work , It is going well, the second evacuation was laid, glued and buried ..

The hot water took it up .. and finally a washing machine also ..




The floor of the new toilets are installed (the toyo red in the picture is a bit behind ki, not a definitive toyo lol)


remains to be done;
-finish tile the toilet, put the paper and install the bowl ..
-install the sliding door of the closet of a washing machine and water heater ..
-lay the 2 doors of the bathroom and laundry.
tiles cut-off corridor (without farting others), re-level and with the same tile recarreler ..
-wall and remove the old bathroom door and re-opening in the bathroom, giving the shower ..
-flowing screed with the evacuation of the shower, bring water to the ceiling of 2 infants, plastering, tiling, putting tiles, ect ....
-fart all the old tiles in the bathroom, put it all straight, and recarreler ..
-BRIEF OF WORK IS STILL has that train there, everything will be finished for Christmas ...
@ +

Tuesday, July 21, 2009

Velva Slurping Her Own Milk

Work, more ...

Hello! Then in the saga, I'm dust, I ask the grinder .. Here we reach the summit dust that gets everywhere, enough to make a heart attack Daniel and Beatrice, MDR. But must say what is good as well even practice (with a diamond disc nine, preferably).





So here is the result, the evacuation of new toilets, with an unexpected bonus, the pipe will supply water generally in the same trench to get directly under the new location of the heater. As it ends the pipe that was 10cm above the wall in the bathroom .. :-)




After he has had to dig the ground to make the connection until the pit was shit ... not yet connected to prevent odors, lol.

@ + + +



Still to level the soil, sand plaster, tile the bathroom .. All this planned before the holiday departure, scheduled for August 7, we take the tent and all the gear of the camper and to St Malo, from the time I wanted to visit Mont-St-Michel, hoping also eat two, three cakes .. lol ..